LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2018 >> Charger Pursuit, 5.7L Eng VIN T, 4WD >> Repair and Diagnosis >> Drivelines & Axles >> Differentials & Drive Axles >> Front Axle >> Adjustments >> Bearing Preload >> Differential Side Bearing Preload

Differential Side Bearing Preload

NOTE:

Differential side bearing preload is controlled and adjusted by means of select-thickness shims sandwiched between the side bearing cups and the housing/cover.

NOTE:

For accurate results, differential side bearing preload must only be measured when the pinion housing assembly is removed from the axle.

GC0081413Courtesy of CHRYSLER GROUP, LLC
  1. Remove pinion housing-to-axle housing bolts (1).
    GC0081415Courtesy of CHRYSLER GROUP, LLC
  2. Remove pinion housing and depth shim (1) from axle assembly.
    GC0081422Courtesy of CHRYSLER GROUP, LLC
  3. Install Torque Tool (special tool #C-4995A, Tool, Differential Bearing Torque) (1) to differential housing as shown in the illustration. Measure and record differential rotating torque. Differential rotating torque should be within 190-260 N.m (17-23 in. lbs.).  If rotating torque is below this range, disassemble housing, measure and install slightly thicker preload shims (1). Add thickness equally to both sides. If rotating torque is above this range, disassemble housing, measure and install slightly thinner preload shims. Remove thickness equally from both sides.
    GC0081423Courtesy of CHRYSLER GROUP, LLC
  4. Remove axle housing cover (5) and differential assembly (3).
    GC0081435Courtesy of CHRYSLER GROUP, LLC
  5. Remove differential side bearing cup from axle housing cover. Install Bearing Remover (special tool #6514, Remover, Bearing Cup) (1).
    GC0081436Courtesy of CHRYSLER GROUP, LLC
  6. Remove differential side bearing cup with Bearing Remover (special tool #6514, Remover, Bearing Cup) (1).
    GC0081437Courtesy of CHRYSLER GROUP, LLC
  7. Remove side bearing preload shim (1).
    GC0081438Courtesy of CHRYSLER GROUP, LLC
  8. Measure preload shim (1) to identify for replacement.
    GC0081437Courtesy of CHRYSLER GROUP, LLC
  9. Install new differential side bearing preload shim (1) into axle housing cover (2).
    GC0081450Courtesy of CHRYSLER GROUP, LLC
  10. Using Handle (special tool #C-4171, Driver Handle, Universal) and Installer (special tool #D-129, Installer, Bearing Cup) press new side bearing cup into cover until it bottoms. Use suitable cup (3) to support and protect cover.
    GC0081439Courtesy of CHRYSLER GROUP, LLC
  11. Using Remover (special tool #9664, Remover, Bearing Cup) (1) and Slide Hammer (special tool #C-637, Slide Hammer, Universal) (2), remove differential side bearing (inboard) cup.
    GC0081438Courtesy of CHRYSLER GROUP, LLC
  12. Measure preload shim (1) to identify for replacement.
  13. Install new differential side bearing preload shim (1) into axle housing.
  14. Using Handle (special tool #C-4171, Driver Handle, Universal) and Installer (special tool #D-145, Installer, Bearing Cup), press differential side bearing cup into housing until it bottoms.
    GC0081423Courtesy of CHRYSLER GROUP, LLC
  15. Install differential/ring gear assembly (3), new cover o-ring seal (4), and cover (5).
  16. Install the cover-to-housing bolts and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
    GC0081422Courtesy of CHRYSLER GROUP, LLC
  17. Again verify rotating torque measurement (1). Repeat adjustment procedure until proper rotating torque is obtained.
    GC0081415Courtesy of CHRYSLER GROUP, LLC
  18. Install pinion housing assembly and depth shim (1). Use new o-ring on housing.
    GC0081413Courtesy of CHRYSLER GROUP, LLC
  19. Install the pinion housing-to-axle housing bolts (1) and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .