Diagnostic Test
- CHECK FOR AN ACTIVE DTC NOTE:
Make sure that the engine oil is at the proper level. Also, review the customers oil change history to ensure that the oil is being changed at the correct intervals and that the proper oil viscosity is being used.
- Start the engine and allow it to reach normal operating temperature.WARNING:
When the engine is operating, do not stand in direct line with the fan. Do not put your hands near the pulleys, belts or fan. Do not wear loose clothing. Failure to follow these instructions may result in possible serious or fatal injury.
- With the scan tool, read DTCs and record on the repair order.
Is the DTC active or pending?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to INTERMITTENT CONDITION .
- Start the engine and allow it to reach normal operating temperature.
- OIL PRESSURE SENSOR
- Turn the ignition off.
- Disconnect the EOP Sensor harness connector.
- Turn the ignition on.
- Connect a jumper to the (G6) Oil Pressure Signal circuit at the EOP Sensor harness connector.
- With the scan tool monitor the EOP Sensor state.
- Connect a jumper wire between the (K900) Sensor Ground circuit and the (G6) Engine EOP Signal circuit.NOTE:
Engine EOP voltage should change from approximately 4.9 volts to less than 0.1 volts.
Is the voltage reading within the listed specification when the jumper is installed?
Yes
- Verify that there is good pin to terminal contact in the sensor and Powertrain Control Module connectors. Replace the EOP Sensor if no problems were found in the connector. Refer to SENSOR, OIL PRESSURE, REMOVAL .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
No
- Go To 3NOTE:
Remove the jumper before continuing.
- CHECK THE (G6) OIL PRESSURE SWITCH SIGNAL CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- Turn the ignition off.
- Disconnect the PCM C2 harness connector.CAUTION:
Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install the GPEC Diagnostic Adaptor to perform the diagnosis.
- Connect the (special tool #10436, Adapter, GPEC Diagnostic).
- Measure the resistance of the (G6) Oil Pressure Signal circuit between the EOP Sensor harness connector and the PCM C2 harness connector.
Is the resistance below 3.0 Ohms?
Yes
- Go To 4
No
- Repair the (G6) Oil Pressure Signal circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
- CHECK THE (G6) OIL PRESSURE SIGNAL CIRCUIT FOR A SHORT TO GROUND
- Check for continuity between ground and the (G6) Oil Pressure Signal circuit at the EOP Sensor harness connector.
Is there continuity between ground and the (G6) Oil Pressure Signal circuit?
Yes
- Repair the (G6) Oil Pressure Signal circuit for a short to ground.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
No
- Go To 5
- Check for continuity between ground and the (G6) Oil Pressure Signal circuit at the EOP Sensor harness connector.
- POWERTRAIN CONTROL MODULE (PCM)
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the EOP Sensor and the Powertrain Control Module (PCM).
- Look for any chafed, pierced, pinched or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the Switch and Powertrain Control Module connectors.
- Perform any Service Bulletins that may apply.
Were there any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
No
- Replace and program the Powertrain Control Module (PCM) in accordance with the Service Information. Refer to MODULE, POWERTRAIN CONTROL (PCM), REMOVAL .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .