LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2018 >> Charger Pursuit, 5.7L Eng VIN T, 4WD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 5.7L Engine (Service Information) >> Engine Block >> Crankshaft >> Installation

Engine Block: Crankshaft: Installation

GC0092132Courtesy of CHRYSLER GROUP, LLC
  1. Select the proper main bearings. Refer to STANDARD PROCEDURE - CRANKSHAFT MAIN BEARING - FITTING  .
  2. Install main bearings in block and caps, and lubricate bearings.
  3. Position the crankshaft into the cylinder block.
  4. Install the thrust washers (1).
    GC0081774Courtesy of CHRYSLER GROUP, LLC
    1 - MAIN CAP
    GC0092128Courtesy of CHRYSLER GROUP, LLC
    1 - MAIN BEARING CAPS
    CAUTION:

    The overuse of oils on the threads may cause a Hydro-Lock condition at which may cause inaccurate readings. Incorrect torque values may occur.

    NOTE:

    The main cap crossbolts are torqued after final torque of the main cap bolts. Always use a new crossbolts.

  5. Clean and apply a light oil film to all cap bolts. Install all main bearing caps (1). Install all M12 cap bolts and alternately tighten in two steps using the following sequence.
    Fig 1: Main Bearing Cap Tightening Sequence
    GC0095576Courtesy of CHRYSLER GROUP, LLC
  6. • Step 1 - 28 N.m (20 ft. lbs.).
  7. • Step 2 - Turn main cap bolts an additional 90°.
  8. Install the M8 crossbolts with attached washer/gasket. Starting with crossbolt A, tighten each crossbolt to 31 N.m (23 ft. lbs.).
  9. Repeat crossbolt tightening procedure.
  10. Measure crankshaft end play. Refer to STANDARD PROCEDURE - CRANKSHAFT MAIN BEARING - FITTING  .
    GC0081776Courtesy of CHRYSLER GROUP, LLC
  11. Position the connecting rods onto the crankshaft and install the rod bearing caps. Refer to ROD, PISTON AND CONNECTING, INSTALLATION  .
    GC0095575Courtesy of CHRYSLER GROUP, LLC
    1 - Chain Tensioner
    2 - Camshaft Sprocket
    3 - Crankshaft Sprocket
  12. Install timing drive (2). Refer to CHAIN AND SPROCKETS, TIMING, INSTALLATION  .
    GC0095573Courtesy of CHRYSLER GROUP, LLC
  13. Install oil pump. Refer to PUMP, ENGINE OIL, INSTALLATION  .
    GC0081770Courtesy of CHRYSLER GROUP, LLC
  14. Install the timing chain case cover (1) - INSTALLATION). Refer to COVER(S), ENGINE TIMING, INSTALLATION  .
    GC0081773Courtesy of CHRYSLER GROUP, LLC
  15. Install the rear main seal and retainer. Refer to INSTALLATION  .
  16. Install the windage tray/oil pan gasket.
  17. Install the oil pick up tube.
  18. Install the oil pan. Refer to PAN, OIL, INSTALLATION  .
    GC0144947Courtesy of CHRYSLER GROUP, LLC
  19. Install the vibration damper. Refer to DAMPER, VIBRATION, INSTALLATION  .
  20. Install the engine. Refer to INSTALLATION  .
  21. Connect the negative battery cable.
NOTE:

The Cam/Crank Variation Relearn procedure must be performed using the scan tool anytime there has been a repair/replacement made to a powertrain system, for example: flywheel, valvetrain, camshaft and/or crankshaft sensors or components.